Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | No |
Still deciding? Get samples of US$ 200/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Stabbing Guides model SG is mainly used for protecting pipe connectors when the male and female connectors for tubing and casing are stabbed during oil or nature gas well drilling and well repairing operations. This stabbing guide is simple in structure safe and reliable, and easy for operation.
(1). The stabbing guide is adaptable to the outside diameter of the new or worn coupling, through adjusting the length of latch screw.
(2). The stabbing guide has a relatively large guiding conical surface.
(3). The screw thread and coupling are not damaged with composite material used.
(4). The operation of latch lock is flexible and convenient.
(5). Nitrile rubber material or Nylon material is better material for long-life operation.
Specification
Model | Applicable diameters of tubulars in |
Model | Applicable diameters of tubulars in |
SG 2-3/8" T | 2-3/8" Tubing | SG 7-5/8" C | 7-5/8" Casing |
SG 2-7/8" T | 2-7/8" tubing | SG 8-5/8"C | 8-5/8" Casing |
SG 3-1/2" T | 3-1/2" Tubing | SG9-5/8" C | 9-5/8" casing |
SG 4" T | 4" tubing | SG 10-3/4"C | 10-3/4" casing |
SG4-1/2" T | 4-1/2" Tubing | SG11-3/4 C | 11-3/4" Casing |
SG4-1/2" C | 4-1/2" Casing | SG13-5/8" C | 13-5/8" Casing |
SG5" C | 5in Casing | SG13-3/8" C | 13-3/8" Casing |
SG5-1/2" C | 5-1/2" Casing | SG14" C | 14" Casing |
SG6" C | 6" Casing | SG16" C | 16" Casing |
SG6-5/8" C | 6-5/8" Casing | SG18-5/8" C | 18-5/8" Casing |
SG 7" C | 7" Casing | SG20" C | 20" Casing |
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.