Customization: | Available |
---|---|
After-sales Service: | The Warranty Period Is 1 Year, and Repair Kits Can |
Warranty: | The Warranty Period Is 1 Year, and Repair Kits Can |
Still deciding? Get samples of US$ 1600/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. The chain encloses the pipe so that the chain shaft enters the bayonet and rotates the handle to rotate the pipe.
2. Protect your life and property, please do not overload it.
3. This product is intended for use only as a rotating pipe, no other purpose.
4. Chain pipe wrenches with specifications 41/4 ~ 10 3/4, the jaws can be rotated 180° for installation.
5. Please pay attention to rust prevention.
6. Standard API 7K
OD Size | Qty of Chain Unit | Qty of Die | Qty of Groove plate | Rated Torque |
41/4~43/4 | 9 | 4 | / | 10 kN.m |
43/4~53/4 | 11 | 2 | 2 | |
53/4~65/8 | 13 | |||
65/8~71/2 | 15 | |||
71/2~81/4 | 17 | |||
81/4~9 | 19 | |||
9~97/8 | 21 | |||
97/8~103/4 | 23 |
Lake Petro is located in Dongying City, which is famous for Shengli Oilfield and the largest manufacturing hub of petroleum equipment in China. Following the principle of "quality first, science and technology innovated, people oriented", every Lake Petro person is sparing no effort to provide the customers with best products and services. Our products are based on advanced production line and testing equipment, our products are designed and manufactured according to certification of ISO, GOST, etc.
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.