Customization: | Available |
---|---|
After-sales Service: | The Warranty Period Is 1 Year, and Repair Kits Can |
Warranty: | The Warranty Period Is 1 Year, and Repair Kits Can |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Well Control Professional Tube BOP Control Line
--GNG High-pressure Fire-resistant and Heat-insulation Hose Assembly
Patent No.:ZL 92 104811.4
1,Scope of application:
The hose for well control-GNG high-pressure, fire-resistant and heat-insulation hose assembly is mainly used for the hydraulic control of the BOP for drilling and for hydraulic transmission at high-temperature and flammable places in the metallurgic industry.
2,Product classification: high molecular polymer jacket type, stainless steel armored jacket type and braided stainless steel wire jacket type.
3,Applicable Standard: API Spec 16D-0109 SY/T5053.2-2002
Specification for hose and indices for technical properties
Nominal |
Outer dia.of hose assembly |
Operating Pressure |
Min.burst Pressure |
Min. bending radius |
Thread |
Operating time (min)with fire-resisting at 750ºC |
|
Normal |
Limit |
||||||
19 |
44 |
35 |
105 |
280 |
NPT |
5 |
25 |
50 |
70 |
175 |
|||||
22 |
47 |
35 |
105 |
320 |
|||
53 |
70 |
175 |
|||||
25 |
50 |
35 |
105 |
360 |
|||
56 |
70 |
175 |
|||||
31.5 |
56 |
35 |
105 |
460 |
|||
62 |
70 |
175 |
|||||
38 |
63 |
35 |
105 |
560 |
|||
69 |
70 |
175 |
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.