Customization: | Available |
---|---|
API: | API Spec 16A |
Transport Package: | Standard Export Package |
Still deciding? Get samples of US$ 500/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Casing Scraper is ideal for the removal of dirt which may be left over the inside walls of casing, such as solid cement, hard wax, various salt crystals or deposits, perforation burrs, iron oxide residues resulted from rusting, so as to make all down hole tools pass through unblocked. Especially when a small circular clearance is available between the down hole tools and casing inside diameter, the complete scrapping becomes more necessary before further working. At present in the large petroleum well scrapping in the internal wall of casing by use of casing scraper is a necessary step.
Type
|
Mandrel O.D. (mm)
|
Max. O.D of blade extension (mm)
|
Min O.D of blade extension (mm)
|
Thread type
|
Total length (mm)
|
GX114
|
92
|
111
|
92
|
2 3/8 REG
|
880
|
GX127
|
103
|
121
|
103
|
2 3/8REG
|
880
|
GX140
|
110
|
133
|
115
|
NC31
|
1000
|
GX146
|
110
|
139
|
121
|
NC31
|
1000
|
GX168
|
130
|
162
|
137
|
3 1/2REG
|
1150
|
GX178
|
136
|
170
|
146
|
3 1/2REG
|
1150
|
GX194
|
136
|
186
|
162
|
3 1/2REG
|
1200
|
GX219
|
142
|
212
|
185
|
4 1/2REG
|
1400
|
GX245
|
200
|
238
|
210
|
4 1/2REG
|
1500
|
GX273
|
228
|
268
|
237
|
6 5/8REG
|
1500
|
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.