Customization: | Available |
---|---|
Transport Package: | Standard Export Package |
Specification: | 500KG |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Application
Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well's technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve's opening, so balanced drilling can work under minimum pressure-difference.
2. Configuration
Choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components.
3. Working Principles
When the pressure inside the well rises, opening/closing the choke valves (including manual chokes, hydraulic chokes and positive chokes) on the choke manifold can allow the release of the fluid inside the well so as to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.
Item Name | Choke Manifold | Kill Manifold | ||||||
Model | JG/S2-35 | JG/SY-35 | JG/SY2-70 | JG/S2Y2-105 | YG-35 | YG-70 | YG-105 | |
Main path and Side path( in mm) | 3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78) | |||||||
Working Pressure Psi(mpa) | 3000(21) | 3000(21) | 5000 | 10000 | 15000 | |||
5000(35) | 10000(70) | |||||||
-35 | -70 | -105 | ||||||
Working Temperature°C(°F) | P.U -29~121 (-20~250) | |||||||
Working medium | Mud Gas(sulfur-hydrogen) | |||||||
Control type | Manual both-wings choke manifold | Hydraulic manual both-wings choke manifold | Hydraulic manual three-wings choke manifold | Hydraulic manual Four-wings choke manifold | Both-wings atmospheric valve |
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.