Customization: | Available |
---|---|
Customized: | Non-Customized |
Certification: | CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Casing Scraper is ideal for the removal of mud, cement, bullets, rust, scale, paraffin, perforation burrs and other obstructions from the inside walls of casing. Maintaining a clean casing I.D. is important when operating drilling, fishing, or wireline tools.
Features:
1. Full circle blades contact 600° surface at once.
2. Short, compact, easy to assemble and disassemble.
3. Longer guide taper on blades for passing through joints without hanging.
4. Vertical and rotary operation may be run on wireline or drill pipe.
5. Investment cast tool steel blades allows maximum scraping ability.
Type | Scraper range | Connection | All length mm(inch) | ID mm(inch) | Qty. of blade |
GX 4-1/2 | 92-112 | 2-3/8REG | 895 | 25 | 2×3 |
GX 5 | 95-118 | NC26 | 895 | 25 | 2×3 |
GX 5-1/2 | 110-133 | 2-7/2REG | 1010 | 32 | 2×3 |
GX 6-5/8 | 136-162 | 3-1/2REG | 1010 | 32 | 2×3 |
GX 7 | 142-168 | 3-1/2REG | 1010 | 32 | 2×3 |
GX 8-5/8 | 177-155 | 3-1/2REG | 1200 | 38.1 | 2×3 |
GX 9-5/8 | 209-235 | 4-1/2REG | 1212 | 57 | 2×5 |
GX 10-3/4 | 260-240 | 6-5/8REG | 1500 | 57 | 2×5 |
GX 13-3/8 | 290-330 | 6-5/8REG | 1372 | 71 | 2×7 |
Lake Petro is located in Dongying City, which is famous for Shengli Oilfield and the largest manufacturing hub of petroleum equipment in China. Following the principle of "quality first, science and technology innovated, people oriented", every Lake Petro person is sparing no effort to provide the customers with best products and services. Our products are based on advanced production line and testing equipment, our products are designed and manufactured according to certification of ISO, GOST, etc.
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.