Customization: | Available |
---|---|
Transport Package: | Standard Export Package |
Specification: | 100KG |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Pup joints (flowline pipes) are pipe lines with thread, flange or union connectors on both ends, designed to be compatible with FMC Chiksan pup joints and SPM pup joints.Various pup joints are available for high/low pressure and temperature and H2S environment,such as integral pup joints( 10 feet length to handle fluids at cold working pressure), sour gas pup joints, pressure thread seal straight pipes and non-pressure thread seal pup joints.
Integral with retention Shoulder | ||||||||||||||||
Size | Weco union end | CWP | 3ft(914mm) | 4ft(1219mm) | 3ft(914mm | 5ft(1524mm) | 6ft(1829mm) | 10ft(3048mm) | 12ft(3658mm) | |||||||
Psi | ||||||||||||||||
(bar) | ||||||||||||||||
Pn | Lb | Pn | Lb | Pn | Lb | Pn | Lb | Pn | Lb | Pn | Lb | Pn | Lb | |||
(kgs) | (kgs) | (kgs) | (kgs) | (kgs) | (kgs) | (kgs) | ||||||||||
2" | 1502 | 15,000 (1034) | P516825 P516825-LT | 41 (18.6) | P516823 P516823-LT | 50 (22.7) | P516821 P516821-LT | 58 (26.3) | P516820 P516820-LT | 67 (30.4) | P516810 P516810-LT | 84 (38.1) | P516485 P516485-LT | 101 (45.8) | P516817 P516817-LT | 118 (53.5) |
3" | 1502 | 15,000 (1034) | P517538 P517538-LT | 73 (33.1) | P517582 P517582-LT | 91 (41.3) | P517664 P517664-LT | 108 (49) | P517672-LT | 125 (56.7) | P517674 P517674-LT | 160 (72.6) | P517111 P517111-LT | 195 (88.5) | CF | |
3" | 2002 | 20,000 (1380) | P502323 | 151 (68.5) | P502324 | 205 (93) | P519440 | 257 (117) | P502326 | 313 (142) | P519441 P519441-LT | 365 (166) | P525905 P525905-LT | 542 (246) | P502327 | 583 (264) |
4" | 1502 | 15,000 (1034) | CF | P520516 P520516-LT | 249 (113) | P518458 P518458-LT | 247 (112) | CF |
Our Services
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.