• Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End
  • Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End
  • Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End
  • Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End
  • Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End
  • Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End

Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End

After-sales Service: 3months
Warranty: 3months
Manufacturing Process: Forging
Surface Treatment: Sand Blast
Operation Pressure: Atmospheric Pressure
Material: Alloy
Samples:
US$ 50/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
QPA1000
Pump Mode
Qpa1000
Transport Package
Wooden Case
Specification
All size
Trademark
Lake
Origin
China
HS Code
8431
Production Capacity
1000PCS/Year

Product Description

QPA1000 Pump Bull Gear Pinion Shaft Bearing for power end

we can supply all kinds of spare parts for plunger pump QPA1000, triplex mud pump F-500, F-800, F-1000, F-1300, F-1600, 3NB 500C, 3NB 800, 3NB 1000, 3NB 1000C, SL3NB 1300, SL3NB 1300C, SL3NB 1600 and crown block TC170, TC225, TC315, TC450, rotary hook, swivel, rotary table ZP175, ZP205, ZP275, ZP375, travelling block YC225, YC250, YC350, YC450, etc. 
 
Please do not ehsitate to send us inquity list with part numbers.

Qpa1000 Pump Bull Gear Pinion Shaft Bearing for Power EndQpa1000 Pump Bull Gear Pinion Shaft Bearing for Power EndQpa1000 Pump Bull Gear Pinion Shaft Bearing for Power End

FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.

3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

Contact:
Lucky Hou
Business Development Manager
Dongying Lake Petroleum Technology Co., Ltd
p: 0086-546-7080020  m: 0086-13854614085
a: Huanghe Road, Dongying City, Shandong, China
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now