Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | Online |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ZQ drill pipe power tong is an ideal well head tool for oil well drilling, widely applied for making-up and breaking-out in offshore and onshore drilling operations and workover operations. Open-throat design of the ZQ series allows the tongs to escape from drilling pipe freely with high mobility. The tong is a combination of spinning tong and torque tong. It substitutes cathead, manual tong and rotary rope in making-up and breaking-out.The tongs are designed and manufactured according to API Spec 7K " Specification for drilling and well servicing Equipment.
Model | ZQ203-100 |
Size range | 114-203mm |
Max.torque | 100KN.M |
Speed | 2.7-40 rpm |
Air pressure | 0.5-0.9Mpa |
Pressure rating | 16.6Mpa |
Flow rating | 114L/MIN |
Shifting distance | 1500mm |
Size | 1760*1000*1360mm |
Weight | 5290MM |
Lake Petro company is a professional supplier of various oilfield equipment, including oil drilling and service equipment,oil production equipment,OCTG ,wellhead & downhole tools and spare parts with API certification. our products have already been exported to USA, South America, Africa, Middle East, Russia and some other countries (regions). Lake Petro company has become VIP (assigned) supplier and built strategic partnership with some coutries' national petroleum companies.
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.