API 7K F1000 Mud Pump Discharge Hydraulic Module Hydraulic Box
Product Description:
1. Module is made from 4135 alloy steel with strict forging and heat treatment process.
2. Mud pump fluid end parts offer full lines of Cylinder Head, Valve Lock Cover, Cylinder Head Threaded Ring, Cylinder head Plug, Valve Cover Plug, Upper Valve Guide, Lower Valve Guide, Liner Threaded Ring, Liner Lock, Wear Plate and much more.
3. Three types of Liner:High chrome sleeve/single shell/zirconia ceremic liner.
4.Pony rod and piston rod is made of premium quality,heat treated alloy steel.
5.Valve and seat assembly are made of forged alloy steel with deep carburized wear surface. We offer a full range of valves and seats which include full open valve and seat, 3 web / 4 web design valve and seat .
Our main products
1.Fluid End Pump Parts:Liners,Piston Rod and Pony Rod,Piston and Hubs,Fluid End Modules and Accessories, Valve and Seat for all major brand mud pumps etc.
Application pumps:
Brand |
Model |
Emsco |
F-350 |
F-500 |
F-650 |
F-800 |
F-1000 |
FA-1300 |
FB-1300 |
FA-1600 |
FB-1600 |
|
|
|
|
|
Gardener Denver |
PZ-7 |
PZ-8 |
PZ-9 |
PZ-10 |
PZ-11 |
|
|
National |
7-P-50 |
8-P-80 |
9-P-100 |
10-P-130 |
12-P-160 |
|
|
IDECO |
T-800 |
T-1000 |
T-1300 |
T-1600 |
|
|
|
Oil Well |
A-350 |
A-560 |
A-650 |
A-850 |
A-1100 |
A-1400 |
A-1700 |
China |
3NB-350 |
3NB-500 |
3NB-800 |
3NB-1000 |
3NB-1300 |
3NB-1600 |
3NB-220 |
Pictures for reference:


FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Contact:
Lucky Hou |
Business Development Manager |
Dongying Lake Petroleum Technology Co., Ltd |
p: |
0086-546-7080020 m: 0086-13854614085 |
a: |
Huanghe Road, Dongying City, Shandong, China |