• Jq-Y Hydraulic Shock Absorber for Oilfield
  • Jq-Y Hydraulic Shock Absorber for Oilfield
  • Jq-Y Hydraulic Shock Absorber for Oilfield
  • Jq-Y Hydraulic Shock Absorber for Oilfield
  • Jq-Y Hydraulic Shock Absorber for Oilfield
  • Jq-Y Hydraulic Shock Absorber for Oilfield

Jq-Y Hydraulic Shock Absorber for Oilfield

Product Name: Mechanical 4 3/4 Nc38 Drilling Jars for Oilfield
Certification: API
Material: Carbon Steel
Machine Type: Drilling Equipment
Transport Package: Standard Export Package
Specification: 200KG
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
JQ-Y
Trademark
Lake Petro
Origin
China
Production Capacity
1000PCS/Year

Product Description

JQ-Y Hydraulic Shock Absorber for oilfield

 
Product Description
JQ-Y hydraulic shock absorber can use it's inner compressible liquid to absorb or reduce impact and shock load on drill bits and drilling tools in drilling operations, protect drill bit teeth, bearing and drilling tools, prolong working life of drill bits and drilling tools.
 

ype   

 

OD
(mm/inch)   

ID
(mm/inch) 

Connection
(API)

Max.upward jarring force
(KN)

Ma.downward jarring force
(KN)

overall length
(mm/inch)

BZ121

121(4-3/4)

50.8(2)

NC38

450

230

6356(250)

BZ159

159(6-1/4)

57.2(2-1/4)

NC50

630

360

7265(286)

BZ165

165(6-1/2)

57.2(2-1/4)

NC50

630

360

7265(286)

BZ196

196(7-3/4)

71.4(2-13/16)

6-5/8REG

820

460

7062(287)

BZ203

203(8)

71.4(2-13/16)

6-5/8REG

820

460

7062(287)

 

Our Services

Jq-Y Hydraulic Shock Absorber for Oilfield

FAQ

 

How can I place order? 

A: You can contact us by email about your order details, or place order on line. 


How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.

What's the order procedure? 
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. 

How do you take care when your clients received defective products? 
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now